Construction Phase Plan MTV World Stage and Music Week

Page 1

1.0.0 01/11/2024

Page 2

1 Construction Phase Plan: MTV WORLD STAGE / MUSIC WEEK 1.0 Description of the project 2.0 Management of the Construction Phase 3.0 References 4.0 Document Control 5.0 Online Resources

Page 3

2 Construction Phase Plan: MTV WORLD STAGE / MUSIC WEEK Construction Phase Plan Issue Date: 01/11/2024 Revision: 1.0.0 1.0 Description of the Project and Pre-Construction Information 1.1 Client PARAMOUNT 1.2 Principal Contractor PARAMOUNT 1.3 Principal Designer PARAMOUNT 1.4 Contractor information Contractor Provision Document Link Sterling Event Group Music week AV Click Here Smith and Steadi Steadi cam Click Here Luna (Camera) Camera Click Here LCR LX and Rigging Click Here Hot Cam OB Click Here Brit Row Audio Click Here B360 Generator Click Here Soundesign OB Audio Click Here New Century Hall Venue Services Click Here

Page 4

3 Construction Phase Plan: MTV WORLD STAGE / MUSIC WEEK Construction Phase Plan Issue Date: 01/11/2024 Revision: 1.0.0 1.5 Venue New Century Hall, Manchester 1.6 Description of works The construction phase of the plan for rigging all elements and infrastructure for the main World Stage event, and Music Week event at New Century Hall. Rigging activity will entail manual handling, unloading/ loading, lifting operations and electrical work, and some working at height via ladders and platforms. 1.7 Timescale for the works Build/ Set up of event – 1 day. Event – Music Week – 3 days, World Stage 1 day De-rig/ Breakdown of event – ½ day (overnight) 1.8 Key Roles in the Event Team: Caroline Lloyd – Line Producer Beth Baxter – Production Manager Isabella Arndt – Music Week Producer Venue Manager – Zak Padmore Venue Production Manager – Mish Thomson Tech Manager – Dom Peissel ESA – Ben Harding 2.0 Management of the Construction Phase 2.1 Pre-production Main contractors have submitted documentation prior to the event. 2.2 Onsite All contractors will confirm in advance of arrivals on site, that their staff have received site safety and welfare information. Contractors not confirming this in advance will not be able to collect accreditation for any of their staff. The preconstruction induction information will outline site rules, welfare facilities, first aid, incident reporting, fire and emergency procedures. Works will be monitored and managed by the event management team mentioned in 1.8 to make sure all works is carried out correctly in accordance with legislation and supplied RAMS. All equipment to be suitable for task and checked before use to make sure in adequate working order, suitable fall prevention means implemented for work at height, vehicle movement within the EXT OB compound to be controlled by banksman if required,

Page 5

4 Construction Phase Plan: MTV WORLD STAGE / MUSIC WEEK Construction Phase Plan Issue Date: 01/11/2024 Revision: 1.0.0 work area and high-risk areas segregated where necessary. 2.3 Assurances Main contractors pre vetted prior to on site 3.0 Reference 3.1 Event Safety Management Plan (ESMP) Current version of the ESMP should be referenced via the online link – Click Here 3.2 Induction This will be carried out by every contractor before arriving onsite. The briefing includes sign in/out, site rules, welfare facilities, first aid, incident reporting, fire and emergency procedures if not read prior to site arrival (during construction phase) 4.0 Document Control 4.1 Name Ben Harding 4.2 Position HS Advisor 4.3 Company ESS Consultants

Page 6

5 Construction Phase Plan: MTV WORLD STAGE / MUSIC WEEK 5.0 Online Resources

Page 7

6 Construction Phase Plan: MTV WORLD STAGE / MUSIC WEEK